Started work on re-doing the greenhouse entry with more permanent masonry installations.
Laid out the foundation with some extra bricks and filler pieces:

Set and filled in the gaps in prep for the the top step installation:

And the final steps:

These pieces are leftover capstone from wall sections we installed back in 2008-2009.
Next: re-do the more complicated entry steps on the other side of the threshold.