Started work on re-doing the greenhouse entry with more permanent masonry installations.
Laid out the foundation with some extra bricks and filler pieces:
![](https://static.wixstatic.com/media/d4f588_72b8c97d84fb46508c6f2abd46f3b6b5~mv2_d_2000_1500_s_2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_72b8c97d84fb46508c6f2abd46f3b6b5~mv2_d_2000_1500_s_2.jpg)
Set and filled in the gaps in prep for the the top step installation:
![](https://static.wixstatic.com/media/d4f588_215f9ee08d6b44c08eb509a1f60dcc97~mv2_d_2000_1500_s_2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_215f9ee08d6b44c08eb509a1f60dcc97~mv2_d_2000_1500_s_2.jpg)
And the final steps:
![](https://static.wixstatic.com/media/d4f588_63a19454f2c04dbab21ab12477a31322~mv2.jpg/v1/fill/w_980,h_482,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_63a19454f2c04dbab21ab12477a31322~mv2.jpg)
These pieces are leftover capstone from wall sections we installed back in 2008-2009.
Next: re-do the more complicated entry steps on the other side of the threshold.