Dug the footings and poured concrete pilings for 6 x 6 post brackets:
![](https://static.wixstatic.com/media/d4f588_b826191e71e749a289ecf7ca7888b88c~mv2_d_1500_2000_s_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_b826191e71e749a289ecf7ca7888b88c~mv2_d_1500_2000_s_2.jpg)
Verticals and seat support structure added:
![](https://static.wixstatic.com/media/d4f588_d5cca015b20a40a090f226d346b4dd24~mv2_d_2000_1318_s_2.jpg/v1/fill/w_980,h_646,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_d5cca015b20a40a090f226d346b4dd24~mv2_d_2000_1318_s_2.jpg)
Roof structure installed:
![](https://static.wixstatic.com/media/d4f588_bf0f494c6aef448cb26a1fa7cb0a2eff~mv2_d_1430_2000_s_2.jpg/v1/fill/w_980,h_1371,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_bf0f494c6aef448cb26a1fa7cb0a2eff~mv2_d_1430_2000_s_2.jpg)
Johnny putting in the roofing shingles (leftovers from house facade sidewall shingling project):
![](https://static.wixstatic.com/media/d4f588_823781879994480a93549a9801e31fc1~mv2_d_1500_2000_s_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_823781879994480a93549a9801e31fc1~mv2_d_1500_2000_s_2.jpg)
Staining completed. Stone for bench added (found this piece of greyish-green granite in a dumpster outside a dealer closing shop. Bench concept designed around this 104" x 14" remnant.) Hardy backer board covering lower bench structure, prep for ledger stone. Bought those two large stepping stones at KRC (270 lbs total!)
![](https://static.wixstatic.com/media/d4f588_bc4b2f435c2a45b995555c2404355304~mv2_d_1500_2000_s_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_bc4b2f435c2a45b995555c2404355304~mv2_d_1500_2000_s_2.jpg)
Leftover ledger stone from several house facade projects. Didn't have any corner pieces left over, so I had to cut and piece those carefully myself. First time installing this type of material and learned a lot.
![](https://static.wixstatic.com/media/d4f588_5cfeedb4d8574de49eb1cbdddaf211b6~mv2_d_2000_1206_s_2.jpg/v1/fill/w_980,h_591,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_5cfeedb4d8574de49eb1cbdddaf211b6~mv2_d_2000_1206_s_2.jpg)
Dug out the stone pathway AGAIN. Last repair lasted maybe two weeks when a torrential rain storm came through, overflowed the gutters and washed most of the hill into the pathway. Hopefully new plantings will hold the hill better this time...
![](https://static.wixstatic.com/media/d4f588_264be3929e154d40b4a513d7c56d2a91~mv2_d_1500_2000_s_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_264be3929e154d40b4a513d7c56d2a91~mv2_d_1500_2000_s_2.jpg)
Completed project: Installed new irrigation, started the planting process, washed and re-installed the white rock pathway.
![](https://static.wixstatic.com/media/d4f588_a0f918357b324e6f83a937c2a660654e~mv2_d_1500_2000_s_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d4f588_a0f918357b324e6f83a937c2a660654e~mv2_d_1500_2000_s_2.jpg)